What Is an Occupancy Permit? How Is It Obtained? | 2026 Guide
October 1, 2026

When the construction of a new building is completed, it must be officially accepted that the structure was built in accordance with the project and can be used safely. The occupancy permit is the document showing that the building is ready for living or use. If the electrical, water, sewage, and infrastructure connections are complete, the technical conditions are considered to have been met. Independent sections, common areas, and the integrity of the building are inspected. Therefore, obtaining an occupancy permit means legal assurance for building owners. So, where is an occupancy permit obtained? What documents do you need for this?

What Is an Occupancy Permit?
An occupancy permit is the document showing that a structure has been completed in accordance with the legislation and can be officially used. So, the occupancy permit can also be called the "building utilization permit certificate". This report shows that the building was constructed in accordance with the permit and approved projects and provides legal ground for the building to be actually used for residential, commercial, or other purposes. When the occupancy permit is obtained, the real estate is considered completed and usable in the eyes of the administration. Buildings without an occupancy permit, on the other hand, are not legally considered completed and may face restrictions in various transactions.
Difference Between Occupancy Permit and Construction Servitude
The occupancy permit is often confused with construction servitude because both are related to the title deed and construction process. However, their legal meanings and consequences are different. Construction servitude is a real right established for independent sections before the structure is completed. The occupancy permit, on the other hand, shows that the structure is completed and usable. The difference in question is important in terms of sales, loans, subscriptions, and usage rights. Incorrect evaluation can lead to rights losses in the future.
| Differences | Occupancy Permit | Construction Servitude |
| Status of the Structure | Completed building | Structure under construction |
| Legal Meaning | Usage permit | Future ownership right |
| Official Name | Building Utilization Permit Certificate | Construction Servitude Title Deed |
| Usage Right | Actual use is possible | Usage right does not arise |
| Subscription Procedures | Can be done | Generally cannot be done |
Where Is the Occupancy Permit Obtained?
You can obtain the occupancy permit from the authorized municipality where the structure is located. For real estate within municipal boundaries, the application is carried out through the Zoning Department of the relevant municipality. For areas outside municipal boundaries, the authorized institution is the provincial special administrations. During the application process, it is evaluated based on the building permit and approved projects. When examinations are completed, if the conditions are met, the occupancy permit is issued. If you also wonder "where is the occupancy permit obtained?", you can reach the necessary information by entering the website of the municipality where your home/workplace is registered.
Municipality Zoning Department Application Process
To obtain the occupancy permit, you can first apply to the municipality where your structure is located. During the application, you need to have your building permit and approved project documents with you. If the documents are complete, the municipal technical units examine the building on-site and check the compliance of infrastructure, electrical, water, and sewage connections. If a deficiency is detected, you are asked to complete it. When all conditions are met, the occupancy permit is issued and delivered to you. This way, both the official status of your real estate is clarified and possible future legal problems are prevented.
Occupancy Inquiry Through e-Government
You can make an inquiry through e-Government to check information about the occupancy permit, that is, whether the document has been obtained. The occupancy status of the real estate can be viewed through the building and title deed services on e-Government. However, the inquiry procedure is for information purposes; the occupancy permit itself is not obtained from e-Government. Still, thanks to the occupancy permit inquiry, you can quickly check the official status of the structure before purchasing or renting.
Documents Required for the Occupancy Permit
The documents required for the occupancy permit are requested to verify that the structure was completed in accordance with the legislation and safely. Thanks to these documents, the municipality can check the project compliance of the building and that the infrastructure systems are complete. When you submit the documents completely, the occupancy permit process proceeds quickly, and you will not have problems in official records. Required documents may show small differences from municipality to municipality, so consulting with the authorized unit before application makes the process easier.
Basic Application Documents
The basic documents requested in the occupancy permit application are requested to show that the structure has been completed in accordance with its permit and approved projects. The municipality checks both the technical status of the structure and its compliance with official records through the documents. It is important that the documents are up-to-date during the application. The basic documents you need to prepare are as follows:
- Building permit
- Approved architectural project
- Approved static project
- Electrical, mechanical, and sanitary installation projects
- Building inspection organization compliance report
- Building utilization permit application petition
- Title deed or title deed record copy
Additional Documents for Buildings with Elevators
If there is an elevator in the building, additional documents must be requested during the occupancy permit process. This is because elevators are subject to special technical inspection in terms of life and property safety. The municipality evaluates with these documents that the elevator both complies with the project and operates safely. The documents you need to submit in structures with elevators are as follows:
- Elevator project and approval document
- Elevator registration document
- Assembly report prepared by an authorized firm
- Elevator periodic inspection report (red/yellow/green label)
- Maintenance contract
Occupancy Permit Fee and Charge Calculation
The fees to be paid for the occupancy permit are determined according to the municipalities' own 2025 income and charge-fee tariffs. It varies according to factors like the building construction area and the type of building. Tariffs determined within the framework of the Municipal Revenues Law are announced each year with the approval of municipal councils. There are official fees determined for the building utilization permit; in addition, additional items like the municipality's service fee may also come into play. Additionally, you may see different rates for residences and commercial structures in the tariff.
2025 Occupancy Charge Tariff
For the year 2025, many municipalities have determined occupancy permit fees on a square meter basis. Although the legal fee is at low amounts, the total cost including municipal service fees varies according to the construction area and the type of building. That is, the occupancy charge tariff is calculated according to the building's square meters, type of use, and the relevant municipality's 2025 tariff.
Price Differences by Municipality Groups
The main reason for the price difference between municipalities is that each municipality determines its income tariffs according to its own budget and local costs. In metropolitan areas or tourist-intensive regions, municipal service fees and charges are generally higher, while they may be lower in smaller settlements. Additionally, municipalities may apply separate tariffs according to building type (like residential, commercial, industrial). Differences are clearly included in the tariff determined each year by local municipal councils and are announced publicly. Therefore, while a municipality may charge a lower fee per square meter for residences, it may determine a higher occupancy permit fee for commercial structures.
How Many Days Does It Take to Get an Occupancy Permit?
The time for issuing the occupancy permit depends on the structure being actually completed and the application file being submitted in full. Therefore, a definite day limit is not set. The process advances with the completion of technical checks and the conclusion of the municipal examination. If there are no deficiencies in the documents, the transaction is concluded in a shorter time. On average, it can be said to be concluded within 30-60 days.
Can a Title Deed Be Obtained Without an Occupancy Permit?
The occupancy permit is a document regarding the building utilization permit; it is evaluated separately from the title deed registration. According to the legislation, even if the structure has not yet received occupancy, title deed procedures can be done under certain conditions. However, in this case, the structure is not officially considered to have gained usage permission.
How Is Occupancy Permit Inquiry Done?
You can do an occupancy permit inquiry through the records of the relevant municipality and e-Government. Through the building information services on e-Government, the building permit / building utilization permit status of the real estate can be viewed. Municipalities can also provide written information from their own archives about the occupancy status of the building in line with your request. The inquiry is made through the title deed information and address.
Who Can Apply to Get an Occupancy Permit?
To apply for an occupancy permit, you must be either the owner of the structure or an authorized representative. In structures that have not transitioned to condominium ownership, the land owner or a person authorized by all owners can apply. In case power of attorney is given, the transaction can also be done through a representative. That is, the person making the application must be able to document their right to the structure.
Choosing real estate with clear occupancy status, compliance with legislation, and registered title deeds reduces risks in the use and investment process. While examining arsaVev's projects, you can create a safer investment ground by evaluating zoning, title deed, and building utilization permit information together.